23 Aug Foundation work with structure 50kwp IPS,Jind Foundation work with structure mounting at 50kwp IPS, Jind Share:
6kwp solar plant at Mr. Naveen Kumar ,H.no. 1387 ,sector 16-17 Hisar 6kwp solar plant at Mr. Naveen Kumar ,H.no. 1387 ,sector 16-17 Hisar
5kWp solar rooftop grid connected at Ishwar Singh,58 Sector 23,Bhiwani 5kWp solar rooftop grid connected at Ishwar Singh,58 Sector 23,Bhiwani
12kWp solar rooftop Hybrid system at Mata jio devi Institute,Khanda Kheri,Hisar 12kWp solar rooftop Hybrid system at Mata jio devi Institute,Khanda Kheri,Hisar
25KWP ONGRID SOLAR POWER PLANT AT GOVT. LOHIYA COLLEGE CHURU 25KWP ONGRID SOLAR POWER PLANT AT GOVT. LOHIYA COLLEGE CHURU