23 Aug Foundation work with structure 50kwp IPS,Jind Foundation work with structure mounting at 50kwp IPS, Jind Share:
19kWp solar rooftop grid Completed EPC work of 19kWp solar rooftop grid connected at Indus Public School ,Kaithal (Haryana)
30kWp (3 nos.) AC hybrid solar power plant at Partapgarh Completed 30kWp (3 nos.) AC hybrid solar power plant at Partapgarh, Basti and Mirjapur district through Jaiswal battery under UPNEDA
55kwp MINIGRID with PDN in Sonbhadra (UP) 55kwp MINIGRID with PDN in Sonbhadra (UP) under UPNEDA through Jaiswal battery