09 Aug 30kWp (3 nos.) AC hybrid solar power plant at Partapgarh Completed 30kWp (3 nos.) AC hybrid solar power plant at Partapgarh, Basti and Mirjapur district through Jaiswal battery under UPNEDA (Project Value-0.15 Cr Value). Share:
100 kWp solar Minigrid at gajipur Completed 100 kWp solar Minigrid at gajipur with Power distribution network through Jaiswal battery under UPNEDA (Project Value-0.75 Cr Value).
25KWP ONGRID SOLAR POWER PLANT AT GOVT. LOHIYA COLLEGE CHURU 25KWP ONGRID SOLAR POWER PLANT AT GOVT. LOHIYA COLLEGE CHURU
10kwp AC hybrid solar plant at Madarsa Chacha Nehru Aligarh Completed EPC work of 10kwp AC hybrid solar plant at Madarsa Chacha Nehru Aligarh through Vice President House ,New Delhi (Project Value-11.30 Lac Value).
55KWp solar Minigrid at Sonbhadra Completed 55KWp solar Minigrid at Sonbhadra with Power distribution network through Jaiswal battery under UPNEDA (Project Value-0.45 Cr Value).