09 Aug 30kWp (3 nos.) AC hybrid solar power plant at Partapgarh Completed 30kWp (3 nos.) AC hybrid solar power plant at Partapgarh, Basti and Mirjapur district through Jaiswal battery under UPNEDA (Project Value-0.15 Cr Value). Share:
100 kWp solar Minigrid at gajipur Completed 100 kWp solar Minigrid at gajipur with Power distribution network through Jaiswal battery under UPNEDA (Project Value-0.75 Cr Value).
4kWp solar rooftop grid connected at Harshvardhan House,Chandu Gurgaon 4kWp solar rooftop grid connected at Harshvardhan House,Chandu Gurgaon
100 kWp solar Minigrid at Lakhimpur Under Progress 100 kWp solar Minigrid at Lakhimpur with Power distribution network through Jaiswal battery under UPNEDA (Project Value-0.85 Cr Value).
14kWp solar rooftop Grid connected IPS,Pilukhera,Jind 14kWp solar rooftop Grid connected IPS,Pilukhera,Jind