09 Aug 30kWp (3 nos.) AC hybrid solar power plant at Partapgarh Completed 30kWp (3 nos.) AC hybrid solar power plant at Partapgarh, Basti and Mirjapur district through Jaiswal battery under UPNEDA (Project Value-0.15 Cr Value). Share:
6kWp solar rooftop grid connected at H.S.mandiwal Hosue Bhiwani 6kWp solar rooftop grid connected at H.S.mandiwal Hosue Bhiwani
12kWp solar rooftop Hybrid system at Mata jio devi Institute,Khanda Kheri,Hisar 12kWp solar rooftop Hybrid system at Mata jio devi Institute,Khanda Kheri,Hisar
19kWp solar rooftop grid Completed EPC work of 19kWp solar rooftop grid connected at Indus Public School ,Kaithal (Haryana)