10 Aug 20kwp (10 nos.) AC hybrid solar plant 20kwp (10 nos.) AC hybrid solar plant at Tehsil in different district through Jaiswal battery under UPNEDA (Project Value-0.28 Cr Value). Share:
30kWp (3 nos.) AC hybrid solar power plant at Partapgarh Completed 30kWp (3 nos.) AC hybrid solar power plant at Partapgarh, Basti and Mirjapur district through Jaiswal battery under UPNEDA
10kwp rooftop solar power plant at Mr. Parmod, House no. 946 sector 23 bhiwani 10kwp rooftop solar power plant at Mr. Parmod, House no. 946 sector 23 bhiwani
20kwp (10 nos.) AC hybrid solar plant 20kwp (10 nos.) AC hybrid solar plant at Tehsil in different district through Jaiswal battery under UPNEDA (Project Value-0.28 Cr Value).
5kWp solar rooftop grid connected at Ajay Kumar,Tosham Bhiwani 5kWp solar rooftop grid connected at Ajay Kumar,Tosham Bhiwani